COOL

Getting the cam/valve timing right. 99.5 % of my engine building experience is on two stroke motors. Almost everyone who has owned dirt bikes or two stroke street bikes had to tear down the engine for an over pop or rings. You had a couple of options, you could pay someone to do the rebuild for you or you could do it yourself.

I have had a ton of two stroke bikes, mostly street bikes. Most of them were Yamaha RD 400's and a couple of Kawasaki H2's. My dirt bikes where of the Suzuki RM 125 and 250 variety Those of you who have owned these bikes, usually messed with the engine to get more performance. Or in the case of the 79' Daytona Special had the two piece crank split in two on you. I have no idea why Yamaha went with this set up for the Daytona, but in the end you would have to replace it with a single piece crank from a 78' or earlier RD. My collection of RD’s were in various states of repair, and I was constantly messing around with them so I became familiar with their motors in a hurry.

I do not have a whole lot of experience with four strokes other than giving them tune ups, adjusting the valves and carbs every now and then. This is the first four stroke rebuild I have done other than a lawn mower engine or two. And the biggest concern I had was timing the cams. This procedure turned out way easier than I thought it would, at least on this bike.

After tightening the 10mm bolts to 29 ft. lbs. the 6mm bolts to 7.2 ft. lbs. and the head nuts to 14 ft. lbs in the proper sequence, it was time to install the cams and line up the timing marks. The intake cam has a I on it for intake and the exhaust is marked with an “ex”. Then you need to Align the flywheel T mark with the stationary pointer on the crank case.
Next step is to rotate the exhaust cam to line the timing mark with the left side cap mark. Do the same for the intake, put the cam chain on and adjust the whole shooting match till both cam marks and the timing mark are aligned in their proper positions. Torque the cam caps and timing chain guide bolts to 7.2 ft. lbs.

Now it’s time to reinstall the tensioner assembly. First remove the blind bolt, then insert a screw driver into the blind bolt hole and turn clock wise until it stops completely. Install the tensioner and gasket and torque to 8.7 ft. lbs. pull out the screw driver to release tension and set the blind bolt to 4.3 ft. lbs. Reinstall the valve cover and gasket (not in that order)and you’re ready to install the engine in the frame.

Just a case of following the manual and every thing fit together like a glove. This procedure was not too bad on this single with overhead cams, but I suspect it is just a tad more complicated as the number of cylinders increase. Next is the electrical and charging systems, I suspect this is what took this bike out of service in the first place. It basically needs to completely rewired as most of the wiring is shot.

Till Next Time......................


Not my XT, no that wouldn’t make sense, I have not finished procrastinating on that project. We revived Curly’s YZ yesterday after a engine tear down to take measurements and to replace any parts that were in need of replacing. All it really needed was a new set of rings, some new reeds, a powervalve cleaning and a good old carb cleaning and adjustment. The bore was within specs for the .20 over pop that was already on it. The piston looked like new and measured out that way.
It also was a chance to brush up on our drilling and tapping skills. I cannot remember ever snapping off so many screws and bolts. We must have broke off about twelve altogether. Most were all securing body pieces and a couple on the engine cases, so there was not too much drama.No need to crack out the old Helicoil set.

The bike was a bit dirty, mainly because it is a dirt bike. But the frame has quite a bit of boot rash and a few stone chips and such. My pleads to Curly to take off all her clothes so I could give the frame a good going over and a fresh paint job fell on deaf ears. He wanted to get the bike going in a reasonable amount of time, so figuring my bike is still not done, he did not want to wait till December to finish his. I had to remind him, though my bike is almost finished, the first thing I did was strip and paint it. At least all the parts look great.
He said if he was going to keep her, he would consider buying her a new set clothes and putting some make up on her. But he is just looking to turn her around for a quick profit. So after we snugged everything up, added the proper amount of fluids, she started on the third kick. I love two strokes, they are easy to work on, and easy to trouble shoot.
Here are a couple of pics of Curly putting her through her paces. So after about a hour of running her up and down the street to make sure all systems were operating properly and to promote goodwill towards Curly’s neighbors, we figured we had the old girl pretty much sorted out. She ran like new, power wheelies in the first four gears, even with a couple of fat guys pouring the coals to her. I almost forgot how fast two stroke two fifties are, even twenty year old ones.


Till Next Time...............................

 

blogger templates | Make Money Online